Sign In | Join Free | My chinabagsnet.com
China Chengdu Honevice Machinery Equipment Co., Ltd. logo
Chengdu Honevice Machinery Equipment Co., Ltd.
Our greatest success is to create unlimited value for you. Our pride is the most professional technology and the best quality service.
Active Member

4 Years

Home > Lost Wax Investment Casting >

Anti Rust Stainless Steel Lost Wax Casting Aluminum Precision Parts

Chengdu Honevice Machinery Equipment Co., Ltd.
Contact Now

Anti Rust Stainless Steel Lost Wax Casting Aluminum Precision Parts

Brand Name : Honevice

Model Number : blank

Certification : ISO9001

Place of Origin : Chengdu

MOQ : 10 Piece/Pieces

Price : US $0.5 - 99 / Piece

Payment Terms : T/T

Supply Ability : 20000 Piece/Pieces per Month

Delivery Time : 2-4 weeks

Packaging Details : Carton,Crate

Material : Carbon Steel, Stainless Steel, Aluminum Alloy, Brass, etc.

Surface Treatment : Blank

Service : Customized

Application : Blank

Quality Control : 100% Inspection

Shipping : According To Customer's Requirement

Contact Now

Precision Parts Manufacture Lost Wax Investment Casting Parts

Specifiction

Brand Name Certification
Place of Origin
Minimum Order Quantity Price Payment Terms
Honevice ISO9001 Chengdu 10 Piece/Pieces US $0.5 - 99 / Piece T/T
Supply Ability Delivery Time Packaging Details
20000 Piece/Pieces per Month 2-4 weeks Carton+Crate

Processing Steps

Drawing→ Mold → Wax injection→ wax tree assembling→ Shell moulding→ Dewax-buring→ pouring→ Shell removing→ Cuttiing-Griding→ Machining → Deburring → Surface Finishing → Assembly → Quality Inspection→ Packing

Product Details

About us:

Our Business:
We are focus on CNC machining and Investment casting of lost wax. Business includes lost wax precision casting machining, forging machining, die casting machining, bar, tube, plate machining, etc.

How to guarantee the delivery time required by customers?

In order to ensure timely delivery, the following measures are formulated:


1. Organizational measures
Implement specific tasks and responsibilities of progress control personnel at all levels. Conduct follow-up research and analysis, firmly grasp the initiative of production, timely check the causes and formulate remedial measures for those who have not completed the production plan. Strengthen plan management and establish regular production meeting. Implement the total production cycle, constantly check the implementation of each node process period against the plan, timely adjust and dynamically control to ensure the realization of the total planned construction period.


2. Technical measures
According to the delivery time control, work out the operation plan weekly. Check the implementation of the plan every day and adjust it in time. The maintenance and repair of equipment shall be continuously strengthened in use to ensure the integrity of the equipment, so as to ensure and improve the utilization rate of the equipment, so as to avoid the failure or shortage of mechanical equipment affecting the progress of the project. Strengthen the technical management, review the drawings before each process, and carry out detailed technical disclosure. In the production process, the quality of each process shall be tracked and checked. If any quality problem is found, it shall be rectified in time to avoid affecting the next process. Strengthen the quality management, strictly carry out quality control according to the quality assurance measures, ensure the quality of each process is qualified, and put an end to the delay of construction period caused by rework and shutdown caused by product quality.


3. Information management measures
In the process of production and installation, collect relevant data of actual progress, sort out statistics, compare with planned progress, and provide comparison report to customers regularly. Under its control, the weekly operation plan shall be prepared, the progress record shall be made, the progress statistical table shall be filled in, the relations among all aspects shall be coordinated, the measures shall be taken timely, flexibly, accurately and decisively, all kinds of contradictions shall be eliminated, all weak links shall be strengthened, the dynamic balance shall be realized, and the delivery target shall be guaranteed.

Anti Rust Stainless Steel Lost Wax Casting Aluminum Precision PartsAnti Rust Stainless Steel Lost Wax Casting Aluminum Precision PartsAnti Rust Stainless Steel Lost Wax Casting Aluminum Precision Parts

Anti Rust Stainless Steel Lost Wax Casting Aluminum Precision PartsAnti Rust Stainless Steel Lost Wax Casting Aluminum Precision Parts


Product Tags:

lost wax casting aluminum

      

anti rust stainless steel lost wax casting

      

aluminum precision parts

      
Quality Anti Rust Stainless Steel Lost Wax Casting Aluminum Precision Parts wholesale

Anti Rust Stainless Steel Lost Wax Casting Aluminum Precision Parts Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Chengdu Honevice Machinery Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)